The weather is getting cold, and the low temperature is used to prevent deformation of wood products and walls.

The weather is getting cold, and the low temperature is used to prevent deformation of wood products and cracking of wall paint.

Regarding the low temperature weather, the screen is printed in the circle of friends. In addition to being strictly guarded against death, it is not frozen. For the decoration family, the home improvement site also needs extra snacks. In the industry, the low-temperature days have a great impact on the oil-wood project. The construction does not need to be rushed. At the same time, it is recommended that the industry pay attention to the anti-freezing of building materials, in order to prevent deformation of wood products such as furniture and cracking of wall paint.


Oilwood engineering should not be constructed below zero

In the home improvement project, the water, electricity and oil projects are most affected by the temperature. Although the misunderstandings that are not suitable for decoration in winter have already been broken, there are still special issues that need special attention in the seasonal decoration. According to a decoration project manager, in general, if the indoor temperature is lower than 5 ° C, even if the construction period is tight, the owner should stop the workers. However, if there is continuous temperature in the weather, let alone the painter, it may be that the woodworker and the mason have to stop because the performance of the tiles and paints will be affected, while the wood and paint will often be impervious. If you barely work, when the weather gets warmer, there will be problems such as cracking of the paint, mold on the wall, and falling of the tiles.

At the same time, the work of the base layer treatment, leveling, putty, painting and other work on the wall should be dried before proceeding to the next process. According to the project manager, if it is autumn, basically every day can be dried, but in cold weather, even if it is heated, it may take 2-3 days to dry out.

“If it is not dry, it will easily cause cracking.” He said that according to the normal wall treatment process—base treatment, plaster leveling, scraping two times putty, partial repair and polishing, brushing the primer once, brushing the surface twice Paint, it may take 15-20 days. “The owners and the team don’t have to work.”

The weather is getting cold, and the low temperature is used to prevent deformation of wood products and cracking of wall paint.

Low temperature construction of latex paint is easy to repair and difficult to repair

Regular decoration companies have strict requirements in winter construction, latex paints are more "squeaky", and the standards during construction are more stringent. The painter from a decoration thinks that the winter paint construction should be extraordinarily particular, otherwise it will seriously affect the quality of the decoration.

According to a painter, under normal circumstances, when the latex paint is applied, the indoor temperature should not be lower than 5 °C, otherwise it will cause various problems on the wall. Even if varnish is applied, the room temperature must not be lower than 8 °C. For the new housing estates, the general owners will not pay the full heating fee. Therefore, there are many construction conditions in the room. In order to keep up the progress, the decoration company will open the window to ventilate the air during the daytime construction of the latex paint. If the outdoor temperature is low, this method is not acceptable, and some workers will work at night, and the indoor temperature will be higher at night. It will be much lower during the day and less suitable for latex paint construction.


Wild ventilation and closed doors should be avoided

For families that have already been renovated but have not yet stayed, this winter is equally unintentional. Some owners have taken into account the need to exhaust indoor formaldehyde and other harmful substances as soon as possible, and open the doors and windows as soon as they arrive at the new home. Wang Weiwen said that in such weather, wide open doors and windows can easily cause cracks on the wall surface, and the residual moisture between the tiles and the cement will be quickly dried up, which will affect the quality of the paving.

Still others are at the other extreme. Although I did not stay, I also turned on the heating and did not go for a long time. “In this way, the indoor temperature is too high, and the doors and windows are always closed, which will lead to construction quality problems such as floor hollowing and wall paint cracking.”